
pithyone
Member
- Sep 11, 2024
- 21
I'm planning to complete and CTB fairly soon and was wondering if there are any guides or particular advice on what should be done with extra rope at the tie-off point/past the noose knot, presuming that the rope is too long that do not involve cutting the rope. Cutting the rope would be incredibly inconvenient for me and I'm wondering if any alternate options exist so that I can CTB regardless of the unneeded length. Does anyone have any links or resources that deal with this topic-- or failing that could perhaps provide their own personal experience on this sort of thing? Assume I'm using a tree as the anchor.